Description
PZ series intelligent DC energy meter is designed for applications such as DC panels, solar power, telecommunications base stations, and charging ports. This series of instruments can measure voltage, current, power, forward and reverse power in the DC system. It can be used for local display and connected with industrial control equipment, computers, from a measurement and control system.
PZ series intelligent DC energy meter also has a variety of external excuse functions for the user to choose from: RS485 communication interface, Modbus-RTU protocol, relay alarm output, digital input/output. According to different requirements, through the instrument panel keys, you can set the ratio, communication parameters
Appearance

The product meets the relevant technical requirements of the standard Q/GDW1825-2013 DC power meter specification,GB/T29318-2012 Non-vehicle charging electric energy metering for electric vehicles, Q/GDW364-2009 Single-phase energy meter specification.
Parameter
|
Parameters |
Value |
||
|
Input |
DC Voltage |
Input Range |
0~100V,0~500V,0~1000V |
|
Input Resistance |
≥6kΩ/V |
||
|
DC Current |
Input Range |
0~2500A(Shunt or Hall Sensor) |
|
|
Shunt |
Output 75mV |
||
|
Hall |
Output 0~20mA, 0~5V |
||
|
Consumption |
≤1mW |
||
|
Overload |
.2 fold rating(continuous);10fold rating for 1 second |
||
|
Accuracy class |
0.5 class |
||
|
Puls |
Voltage and current :750V, 300A, Default Pulse Constant:100imp/kWh |
||
|
Voltage and current :1000V, 300A, Default Pulse Constant:100imp/kWh |
|||
|
Voltage and current :1000V, 200A, Default Pulse Constant:100imp/kWh |
|||
|
Function |
Measurement of electrical parameters |
U, I, P |
|
Measurement of kWh |
Active kWh (positive and negative) Active kWh (positive and negative) |
|
|
Multi Tariff |
Two sets of timetables, one year can be divided into 4 time zones, each set of timetables can be set to 12 daily time slots,4 rates (F1, F2, F3, F4 are peaks and flat valleys), the minimum interval of the time period is 15 minutes, and the time period can be set across the zero point. (Only for LCD liquid crystal meters) |
|
|
Historical data Record |
It can count the historical electric energy in the last 12 months (electric energy at various rates). (Only LCD meter has) |
|
|
Switch input and output function |
PZ72 has two switch outputs and two switch inputs. PZ96 has two switch outputs and four switch inputs. The switch output is relay output, which can realize "remote control" and alarm output. The switch input can not only collect and display local switch status information but also the remote transmission function can be realized through the RS485 of the instrument, that is, the "remote signal" function. |
|
|
Display |
LCD or LED |
|
|
Communication |
Communication interface: RS485, Communication protocol:MODBUS-RTU or DL/T645-2007 protocol Baud rate 1200, 2400, 4800, 9600, 19200, 38400 optional, infrared is fixed at 1200bps. |
|
|
Switch |
DI |
Dry contact input, built-in power supply of the instrument, photoelectric isolation |
|
DO |
2 relay outputs, normally open contacts, capacity 2A/30VDC or 2A/250VAC |
|
|
Power Supply |
Voltage Range |
85~265VAC、50/60Hz;20~60VDC;100~350VDC |
|
Consumption |
≤2W |
|
|
Insulation Resistance |
≥100MΩ |
|
|
Power frequency withstand voltage |
3kV/1min(RMS) |
|
|
Environment |
Temperature |
Work:-25℃~+65℃;storage:-40℃~+80℃ |
|
Humidity |
≤93%RH Non-condensing |
|
|
Altitude |
≤ 2500m |
|
Dimensions
|
Outline |
faceplate size |
housing size | cut out size | ||||
|
width |
height |
width |
height |
depth |
width |
height |
|
|
72 square |
75±0.2 |
75±0.2 |
75±0.2 |
75±0.2 |
75±0.2 |
75±0.2 |
75±0.2 |
|
96 square |
96±0.2 |
96±0.2 |
96±0.2 |
96±0.2 |
96±0.2 |
96±0.2 |
96±0.2 |

Figure 1PZ72L appearance size

Figure 2 PZ96L appearance size
Installation
|
|
|
Figure3 PZ72L installation dimensions
![product-1-1 )TC]{`M6Z{8}2O96K7N3RVH_](/Content/uploads/2021805736/2021060810133791669cdb85d04163968effcf60e84b46.jpg)
Figure4 PZ96L installation dimensions
Installation method
1) Opening in the fixed distribution cabinet
2) Take out the instrument and take out the clip
3) The instrument is mounted from the Front to the mounting hole, as shown in figure5
4) Insert the instrument clasp to secure the instrument, as shown in figure6
![]() |
![]() |
| Figure5 | Figure6 |
Quotation

Why choose us?
- We are dedicated to providing our customers with affordable DC Energy Meter products without sacrificing quality.
- Our products have been exported to many countries all over the world.
- Our DC Energy Meter products are known for their performance and durability.
- We strengthen the company's mature, growing and potential human resources of various types of supplementary reserves and talent introduction and absorption.
- Our mission is to deliver high-quality DC Energy Meter products and services to our customers.
- Professional after-sales service personnel provide online service all year round and deal with various situations in a timely manner.
- We use the latest technology and manufacturing techniques to create top-quality DC Energy Meter products.
- We realize that efficient operation of production management can effectively reduce the production cost of our DC Panel Meter.
- We work closely with our customers to develop tailored solutions for their specific DC Energy Meter needs.
- Our company adheres to the people-oriented working concept and always demands itself strictly. In the years of development, we take customer demand as the guide, aim at improving customer production efficiency and quality, and provide high-quality products for different partners at reasonable prices and perfect services.
Hot Tags: dc panel meter, China dc panel meter manufacturers, suppliers, factory, DC Din Rail Power Meter, telecom dc energy meter, Digital DC Energy Meter, electricity energy meter, multi circuit dc energy meter, DC multi channel meter















